2002
Authors
Borges Sousa, J; Lobo Pereira, F; Pereira da Silva, E;
Publication
Proceedings of OCEANS'94
Abstract
2002
Authors
Barbosa, LS; Oliveira, JN;
Publication
Functional and Logic Programming, 6th International Symposium, FLOPS 2002, Aizu, Japan, September 15-17, 2002, Proceedings
Abstract
2002
Authors
Borges Sousa, J; Lobo Pereira, F; Pereira da Silva, E; Martins, A; Matos, A; Almeida, J; Cruz, N; Tunes, R; Cunha, S;
Publication
Proceedings of Tenth International Symposium on Intelligent Control
Abstract
2002
Authors
Lopes, R; Castro, LF; Costa, VS;
Publication
Proceedings of the 2002 Workshop on Memory System Performance, MSP 2002
Abstract
Progress in Prolog applications requires ever better performance and scalability from Prolog implementation technology. Most modern Prolog systems are emulator-based. Best performance thus requires both good emulator design and good memory performance. Indeed, Prolog applications can often spend hundreds of megabytes of data, but there is little work on understanding and quantifying the interactions between Prolog programs and the memory architecture of modern computers. In a previous study of Prolog systems we have shown through simulation that Prolog applications usually, but not always, have good locality, both for deterministic and non-deterministic applications. We also showed that performance may strongly depend on garbage collection and on database operations. Our analysis left two questions unanswered: how well do our simulated results holds on actual hardware, and how much did our results depend on a specific configuration? In this work we use several simulation parameters and profiling counters to improve understanding of Prolog applications. We believe that our analysis is of interest to any system implementor who wants to understand his or her own system's memory performance. Copyright 2002 ACM.
2002
Authors
Silva, MF; Machado, JAT; Lopes, AM;
Publication
CLIMBING AND WALKING ROBOTS
Abstract
This paper studies quasi-periodic gaits of multi-legged robot locomotion systems based on the analysis of the dynamic model. The purpose is to determine the system performance during walking and the best strategy to overcome an obstacle. For that objective the robot prescribed motion is characterized in terms of several locomotion and obstacle variables. In this perspective, we formulate three performance measures of the walking robot namely, the mean absolute power, the mean power lost in the joint actuators and the mean force of the interface body-legs per walking distance. A set of model-based experiments reveals the influence of the obstacle position and dimensions in the proposed indices.
2002
Authors
Valadares Tavares, L; Antunes Ferreira, J; Silva Coelho, J;
Publication
International Journal of Project Management
Abstract
The performance of methods to manage projects depends heavily on the features of their project networks. This is particularly true for methods devoted to project scheduling, risk analysis and resources allocation. Therefore, a long line of research has been developed to generate benchmark sets of project networks and several sets have been proposed in the literature. Unfortunately, no comparative analyses of their features were published and hence serious doubts about the comparability of results using different benchmark sets can be raised. In this paper, a multi-dimensional taxonomy for the morphology of project networks is used and four benchmark sets are evaluated: Patterson collection of problems (Patterson JH. A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science 1984;30:854-867) and the sets produced by the generators due to Agrawal et al. Agrawal MK, Elmaghraby SE, Herroelen WS. DAGEN a generator of testsets for project activity nets. European Journal of Operational Research 1996;90:376-382. Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resource - constrained project scheduling problems. Management Science 1995;41:1693-1703. Tavares Tavares LV. Advanced models in project management. Kluwer, 1999 and Tavares et al. Tavares LV, Antunes Ferreira JA. Coelho JS. The risk of delay of a project in terms of the morphology of its network. European Journal of Operational Research 1999;119:510-537. Original results about the lack of representativeness of these sets are obtained showing that misleading conclusions can be deduced. The last set is, by far, that one covering most extensively the morphologic space of instances which could be foreseen because the generation of networks is carried out in terms of an wider range of parameters. This conclusion is quite useful for project managers willing to assess alternative methods to solve their problems based on project networks.
The access to the final selection minute is only available to applicants.
Please check the confirmation e-mail of your application to obtain the access code.