Publications

Publications by José Coelho

2002

A comparative morphologic analysis of benchmark sets of project networks

Authors
Valadares Tavares, L; Antunes Ferreira, J; Silva Coelho, J;

Publication
International Journal of Project Management

Abstract
The performance of methods to manage projects depends heavily on the features of their project networks. This is particularly true for methods devoted to project scheduling, risk analysis and resources allocation. Therefore, a long line of research has been developed to generate benchmark sets of project networks and several sets have been proposed in the literature. Unfortunately, no comparative analyses of their features were published and hence serious doubts about the comparability of results using different benchmark sets can be raised. In this paper, a multi-dimensional taxonomy for the morphology of project networks is used and four benchmark sets are evaluated: Patterson collection of problems (Patterson JH. A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science 1984;30:854-867) and the sets produced by the generators due to Agrawal et al. Agrawal MK, Elmaghraby SE, Herroelen WS. DAGEN a generator of testsets for project activity nets. European Journal of Operational Research 1996;90:376-382. Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resource - constrained project scheduling problems. Management Science 1995;41:1693-1703. Tavares Tavares LV. Advanced models in project management. Kluwer, 1999 and Tavares et al. Tavares LV, Antunes Ferreira JA. Coelho JS. The risk of delay of a project in terms of the morphology of its network. European Journal of Operational Research 1999;119:510-537. Original results about the lack of representativeness of these sets are obtained showing that misleading conclusions can be deduced. The last set is, by far, that one covering most extensively the morphologic space of instances which could be foreseen because the generation of networks is carried out in terms of an wider range of parameters. This conclusion is quite useful for project managers willing to assess alternative methods to solve their problems based on project networks.

2011

Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers

Authors
Coelho, J; Vanhoucke, M;

Publication
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH

Abstract
This paper reports on a new solution approach for the well-known multi-mode resource-constrained project scheduling problem (MRCPSP). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and non-renewable) resource feasible project schedule with a minimal makespan. The problem type is known to be NP-hard and has been solved using various exact as well as (meta-)heuristic procedures. The new algorithm splits the problem type into a mode assignment and a single mode project scheduling step. The mode assignment step is solved by a satisfiability (SAT) problem solver and returns a feasible mode selection to the project scheduling step. The project scheduling step is solved using an efficient meta-heuristic procedure from literature to solve the resource-constrained project scheduling problem (RCPSP). However, unlike many traditional meta-heuristic methods in literature to solve the MRCPSP, the new approach executes these two steps in one run, relying on a single priority list. Straightforward adaptations to the pure SAT solver by using pseudo boolean non-renewable resource constraints has led to a high quality solution approach in a reasonable computational time. Computational results show that the procedure can report similar or sometimes even better solutions than found by other procedures in literature, although it often requires a higher CPU time.

2008

An evaluation of the adequacy of project network generators with systematically sampled networks

Authors
Vanhoucke, M; Coelho, J; Debels, D; Maenhout, B; Tavares, LV;

Publication
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH

Abstract
This paper evaluates and compares different network generators to generate project scheduling problem instances based on indicators measuring the topological network structure. We review six topological network indicators in order to describe the detailed structure of a project network. These indicators were originally developed by [L.V. Tavares, J.A. Ferreira and J.S. Coelho, The risk of delay of a project in terms of the morphology of its network, European Journal of Operational Research 119 (1999), 510-537] and have been modified, or sometimes completely replaced, by alternative indicators to describe the network topology. The contribution of this paper is twofold. Firstly, we generate a large amount of different networks with four project network generators. Our general conclusions are that none of the network generators are able to capture the complete feasible domain of all networks. Additionally, each network generator covers its own network-specific domain and, consequently, contributes to the generation of data sets. Secondly, we perform computational results on the well-known resource-constrained project scheduling problem to prove that our indicators are reliable and have significant, predictive power to serve as complexity indicators.

2023

On the summary measures for the resource-constrained project scheduling problem

Authors
Van Eynde, R; Vanhoucke, M; Coelho, J;

Publication
ANNALS OF OPERATIONS RESEARCH

Abstract
The resource-constrained project scheduling problem is a widely studied problem in the literature. The goal is to construct a schedule for a set of activities, such that precedence and resource constraints are respected and that an objective function is optimized. In project scheduling literature, summary measures are often used as a tool to evaluate the performance of algorithms and to analyze instances and datasets. They can be classified in two groups, network measures describe the precedence constraints of a project, while resource measures focus on the resource constraints of the instance. In this manuscript we make an exhaustive evaluation of the summary measures for project scheduling. We provide an overview of the most prevalent measures and also introduce some new ones. For our tests we combine different datasets from the literature and generate a new set with diverse characteristics. We evaluate the performance of the summary measures on three dimensions: consistency, instance complexity and algorithm selection. We conclude by providing an overview of which measures are best suited for each of the three investigated dimensions.

  • 5
  • 5