New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms

Authors
Coelho, J; Vanhoucke, M;

Publication
COMPUTERS & OPERATIONS RESEARCH

Abstract
The resource-constrained project scheduling problem (RCPSP) is a well-known scheduling problem that has attracted attention since several decades. Despite the rapid progress of exact and (meta-)heuristic procedures, the problem can still not be solved to optimality for many problem instances of relatively small size. Due to the known complexity, many researchers have proposed fast and efficient meta-heuristic solution procedures that can solve the problem to near optimality. Despite the excellent results obtained in the last decades, little is known why some heuristics perform better than others. However, if researchers better understood why some meta-heuristic procedures generate good solutions for some project instances while still falling short for others, this could lead to insights to improve these meta-heuristics, ultimately leading to stronger algorithms and better overall solution quality. In this study, a new hardness indicator is proposed to measure the difficulty of providing near-optimal solutions for meta-heuristic procedures. The new indicator is based on a new concept that uses the o-distance metric to describe the solution space of the problem instance, and relies on current knowledge for lower and upper bound calculations for problem instances from five known datasets in the literature. This new indicator, which will be called the o -D indicator, will be used not only to measure the hardness of existing project datasets, but also to generate a new benchmark dataset that can be used for future research purposes. The new dataset contains project instances with different values for the o -D indicator, and it will be shown that the value of the o-distance metric actually describes the difficulty of the project instances through two fast and efficient meta-heuristic procedures from the literature.

2023

A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem

Authors
Guo, WK; Vanhoucke, M; Coelho, J;

Publication
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH

Abstract
The branch-and-bound (B&B) procedure is one of the most widely used techniques to get optimal so-lutions for the resource-constrained project scheduling problem (RCPSP). Recently, various components from the literature have been assembled by Coelho and Vanhoucke (2018) into a unified search algo-rithm using the best performing lower bounds, branching schemes, search strategies, and dominance rules. However, due to the high computational time, this procedure is only suitable to solve small to medium-sized problems. Moreover, despite its relatively good performance, not much is known about which components perform best, and how these components should be combined into a procedure to maximize chances to solve the problem. This paper introduces a structured prediction approach to rank various combinations of components (configurations) of the integrated B&B procedure. More specifically, two regression methods are used to map project indicators to a full ranking of configurations. The objec-tive is to provide preference information about the quality of different configurations to obtain the best possible solution. Using such models, the ranking of all configurations can be predicted, and these predic-tions are then used to get the best possible solution for a new project with known network and resource values. A computational experiment is conducted to verify the performance of this novel approach. Fur-thermore, the models are tested for 48 different configurations, and their robustness is investigated on datasets with different numbers of activities. The results show that the two models are very competitive, and both can generate significantly better results than any single-best configuration.

2023

Automated design of priority rules for resource-constrained project scheduling problem using surrogate-assisted genetic programming

Authors
Luo, JY; Vanhoucke, M; Coelho, J;

Publication
SWARM AND EVOLUTIONARY COMPUTATION

Abstract
In the past few years, the genetic programming approach (GP) has been successfully used by researchers to design priority rules for the resource-constrained project scheduling problem (RCPSP) thanks to its high generalization ability and superior performance. However, one of the main drawbacks of the GP is that the fitness evaluation in the training process often requires a very high computational effort. In order to reduce the runtime of the training process, this research proposed four different surrogate models for the RCPSP. The experiment results have verified the effectiveness and the performance of the proposed surrogate models. It is shown that they achieve similar performance as the original model with the same number of evaluations and better performance with the same runtime. We have also tested the performance of one of our surrogate models with seven different population sizes to show that the selected surrogate model achieves similar performance for each population size as the original model, even when the searching space is sufficiently explored. Furthermore, we have investigated the accuracy of our proposed surrogate models and the size of the rules they designed. The result reveals that all the proposed surrogate models have high accuracy, and sometimes the rules found by them have a smaller size compared with the original model.

2023

on the summary measures for the resource-constrained project scheduling problem (Jul, 10.1007/s10479-023-05470-8, 2023)

Authors
Van Eynde, R; Vanhoucke, M; Coelho, J;

Publication
ANNALS OF OPERATIONS RESEARCH

Abstract

2023

A method for selecting processes for automation with AHP and TOPSIS

Authors
Costa, DS; Mamede, HS;

Publication
HELIYON

Abstract
Organizations are more frequently turning towards robotic process automation (RPA) as a solu-tion for employees to focus on higher complexity and more valuable tasks while delegating routine, monotonous and rule-based tasks to their digital colleagues. These software robots can handle various rule-based, digital, repetitive tasks. However, currently available process identi-fication methods must be qualified to select suitable automation processes accurately. Wrong process selection and failed attempts are often the origin of process automation's bad reputation within organizations and often result in the avoidance of this technology. As a result, in this research, a method for selecting processes for automation combining two multi-criteria decision -making techniques, 'Analytic Hierarchy Process (AHP) and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS), will be proposed, demonstrated, and evaluated. This study follows the Design Science Research Methodology (DSRM) and applies the proposed method for selecting processes for automation to a real-life scenario. The result will be a method to support the proper selection of business processes for automation, increasing the success of implementing RPA tools in an organization.

2023

Towards a Comprehensive Framework for the Multidisciplinary Evaluation of Organizational Maturity on Business Continuity Program Management: A Systematic Literature Review

Authors
Russo, N; Reis, L; Silveira, C; Mamede, HS;

Publication
INFORMATION SECURITY JOURNAL

Abstract
Organizational dependency on Information and Communication Technology (ICT) drives the preparedness challenge to cope with business process disruptions. Business Continuity Management (BCM) encompasses effective planning to enable business functions to resume to an acceptable state of operation within a defined timeframe. This paper presents a systematic literature review that communicates the strategic guidelines to streamline the organizational processes in the BCM program, culminating in the Business Continuity Plan design, according to the organization's maturity. The systematic literature review methodology follows the Evidence-Based Software Engineering protocol assisted by the Parsifal tool, using the EbscoHost, ScienceDirect, and Scopus databases, ranging from 2000 to February 2021. International Standards and Frameworks guide the BCM program implementation, however, there is a gap in communicating metrics and what needs to be measured in the BCM program. The major paper result is the confirmation of the identified gap, through the analysis of the studies that, according to the BCM components, report strategic guidelines to streamline the BCM program. The analysis quantifies and discusses the contribution of the studies on each BCM component to design a framework supported by metrics, that allows assessing the organization's preparedness in each BCM component, focusing on Information Systems and ICT strategies.