Automation and Operation of Electric Power Systems
Work description
Literature review on real-time simulation, human–machine interfaces (HMI), and industrial-grade communication protocols for automation in electric power systems. Implementation of the interface between OPAL-RT and HMI/SCADA software: connecting the real-time model or digital twin with the SCADA and HMI software platforms. Validation of the developed interfaces, using as a use case one of the potential services to be offered to industrial clients by the x-Energy Lab / collaborative laboratory currently being developed within the ATE project. Preparation of the research grant activity report.
Minimum profile required
Educational background in Electrical Power Systems and/or Automation.
Preference factors
Experience with computational simulation models / MATLAB/Simulink. Knowledge of industrial-grade communication protocols (Modbus TCP, IEC 61850, etc.).
Application Period
Since 16 Oct 2025 to 09 Nov 2025
Centre
Power and Energy Systems