Cookies
O website necessita de alguns cookies e outros recursos semelhantes para funcionar. Caso o permita, o INESC TEC irá utilizar cookies para recolher dados sobre as suas visitas, contribuindo, assim, para estatísticas agregadas que permitem melhorar o nosso serviço. Ver mais
Aceitar Rejeitar
  • Menu
Publicações

2014

Design of Learning Activities - Pedagogy, Technology and Delivery Trends

Autores
Mota, D; Reis, LP; Carvalho, CVd;

Publicação
ICST Trans. e-Education e-Learning

Abstract

2014

Assessing the Magnitude of Creative Employment: A Comprehensive Mapping and Estimation of Existing Methodologies

Autores
Cruz, S; Teixeira, AAC;

Publicação
EUROPEAN PLANNING STUDIES

Abstract
The present study surveys and maps the existing methodological approaches for measuring creative employment. Based on a unique matched employer-employee data-set which encompasses over three million Portuguese workers, we found that the magnitude of the creative class varies considerably between approaches, ranging from 2.5%, using the conventional industry-based taxonomy and 30.8%, using Florida's occupational proposal. The disparities are justified on the basis of the departure definition of what creative employment is and operationalization issues regarding which industries and occupations should be included. Interestingly, when we focus on core creative employment, the figures conveyed by the distinct approaches are strikingly similar (around 6%), suggesting that, at least where core creative employment is concerned, the distinct approaches converge. The diversity of approaches and measurements are not necessarily a bad thing in itself, but has to be adequately acknowledged in order to accomplish adequate public-policy guidance.

2014

Fast pattern-based algorithms for cutting stock

Autores
Brandao, F; Pedroso, JP;

Publicação
COMPUTERS & OPERATIONS RESEARCH

Abstract
The conventional assignment-based first/best fit decreasing algorithms (FFD/BFD) are not polynomial in the one-dimensional cutting stock input size in its most common format. Therefore, even for small instances with large demands, it is difficult to compute FFD/BFD solutions. We present pattern-based methods that overcome the main problems of conventional heuristics in cutting stock problems by representing the solution in a much more compact format Using our pattern-based heuristics, FFD/BFD solutions for extremely large cutting stock instances, with billions of items, can be found in a very short amount of time.

2014

TURTLE - Systems and technologies for Deep Ocean long term presence

Autores
Ferreira, H; Martins, A; Almeida, JM; Valente, A; Figueiredo, A; da Cruz, B; Camilo, M; Lobo, V; Pinho, C; Olivier, A; Silva, E;

Publicação
2014 OCEANS - ST. JOHN'S

Abstract
This paper describes the TURTLE project that aim to develop sub-systems with the capability of deep-sea long-term presence. Our motivation is to produce new robotic ascend and descend energy efficient technologies to be incorporated in robotic vehicles used by civil and military stakeholders for underwater operations. TURTLE contribute to the sustainable presence and operations in the sea bottom. Long term presence on sea bottom, increased awareness and operation capabilities in underwater sea and in particular on benthic deeps can only be achieved through the use of advanced technologies, leading to automation of operation, reducing operational costs and increasing efficiency of human activity.

2014

Solar Power Forecasting in Smart Grids Using Distributed Information

Autores
Bessa, RJ; Trindade, A; Monteiro, A; Miranda, V; Silva, CSP;

Publicação
2014 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC)

Abstract
The growing penetration of solar power technology at low voltage (LV) level introduces new challenges in the distribution grid operation. Across the world, Distribution System Operators (DSO) are implementing the Smart Grid concept and one key function, in this new paradigm, is solar power forecasting. This paper presents a new forecasting framework, based on vector autoregression theory, that combines spatial-temporal data collected by smart meters and distribution transformer controllers to produce six-hour-ahead forecasts at the residential solar photovoltaic (PV) and secondary substation (i.e., MV/LV substation) levels. This framework has been tested for 44 micro-generation units and 10 secondary substations from the Smart Grid pilot in Evora, Portugal (one demonstration site of the EU Project SuSTAINABLE). A comparison was made with the well-known Autoregressive forecasting Model (AR - univariate model) leading to an improvement between 8% and 12% for the first 3 lead-times.

2014

Real-time control for long ohmic alternate current discharges

Autores
Carvalho, IS; Duarte, P; Fernandes, H; Valcarcel, DF; Carvalho, PJ; Silva, C; Duarte, AS; Neto, A; Sousa, J; Batista, AJN; Hekkert, T; Carvalho, BB; Gomes, RB;

Publicação
FUSION ENGINEERING AND DESIGN

Abstract
The ISTTOK tokamak has a long tradition on alternate plasma current (AC) discharges, but the old control system was limiting and lacked full system integration. In order to improve the AC discharges performance the ISTTOK fast control system was updated. This control system developed on site based on the Advanced Telecommunications Computing Architecture (ATCA) standard now integrates the information gathered by all the tokamak real-time diagnostics to produce an accurate observation of the plasma parameters. The real-time actuators were also integrated, allowing a Multiple Input Multiple Output (MIMO) control environment with several synchronization strategies available. The control system software was developed in C++ on top of a Linux system with the Multi-threaded Application Real-Time executor (MARTe) Framework to synchronize the real-time code execution under a 100 mu s control cycle. In addition, to simplify the discharge programming, a visual Human-Machine Interface (HMI) was also developed using the BaseLib2 libraries included in the MARTe Framework. This paper presents the ISTTOK control system and the optimizations that extended the AC current discharges duration to more than 1 s, corresponding to 40 semi-cycles without apparent degradation of the plasma parameters. This upgrade allows ISTTOK to be used as a low-cost material testing facility with long time exposures to nuclear fusion relevant plasmas, comparable (in duration) with medium size tokamaks.

  • 2914
  • 4387