Publicações

Publicações por Manuel Matos

2001

Preliminary results from the MORE advanced control advice project for secure operation of isolated power systems with increased renewable energy penetration and storage

Autores
Hatziargyriou, N; Contaxis, G; Matos, M; Pecas Lopes, JA; Vasconcelos, MH; Kariniotakis, G; Mayer, D; Halliday, J; Dutton, G; Dokopoulos, P; Bakirtzis, A; Stefanakis, J; Gigantidou, A; O'Donnell, P; McCoy, D; Fernandes, MJ; Cotrim, JMS; Figueira, AP;

Publicação
2001 IEEE Porto Power Tech Proceedings

Abstract
In this paper, preliminary results from MORE CARE, a European R&D project financed within the Energy Program are described. This project has as main objective the development of an advanced control software system, aiming to optimize the overall performance of isolated and weakly interconnected systems in liberalized market environments by increasing the share of wind energy and other renewable forms, including advanced on-line security functions. The main features of the control system comprise advanced software modules for load and wind power forecasting, unit commitment and economic dispatch of the conventional and renewable units and on-line security assessment capabilities integrated in a friendly Man-Machine environment. Pilot installations of advanced control functions are foreseen on the islands of Crete, Ireland and Madeira. © 2001 IEEE.

2001

Simulated Annealing for the Unit Commitment problem

Autores
Viana, A; De Sousa, JP; Matos, M;

Publicação
2001 IEEE Porto Power Tech Proceedings

Abstract
Due to their efficiency and their interesting design and implementation features, metaheuristics have been used for a long time with success, in dealing with combinatorial problems. In recent years they have been applied to the Unit Commitment problem with rather interesting results that justify further research in the area. In this paper we present a Simulated Annealing approach to the Unit Commitment problem. Two coding schemes are compared, new neighbourhood structures are presented and some searching strategies are discussed. Preliminary computational experience, performed on some test instances, shows that this approach is flexible, effective and able to handle variations on the problem structure. © 2001 IEEE.

2006

Economic analysis of microgrids including reliability aspects

Autores
Moises Costa, P; Matos, MA;

Publicação
2006 International Conference on Probabilistic Methods Applied to Power Systems, Vols 1 and 2

Abstract
Recently, the new concept of microgrid (mu G) has been emerging on distribution networks as a way to ease the integration of micro generation in LV networks and increase reliability. A mu G is an association of a low voltage distribution network, small modular generation systems (micro-generators), loads and storage devices having some local coordinated functions. This entity can operate in two different modes: interconnected or emergency. In the first mode, the microgrid is connected with the distribution network, importing or exporting electricity and/or ancillary services. When in emergency mode, the microgrid operates isolated from the distribution network and uses local resources, changing from power control to frequency control and, if necessary, shedding load. A micro grid will only be established if its promoters achieve sufficient advantages that justify the incurred costs, namely the investment, operation and maintenance costs. The main purpose of this paper is to identify all the relevant costs and benefits and build a decision model for the situation, taking into account the regulatory framework, which is essential for the definition of some of the benefits. The paper also shows how to include in the evaluation the risk associated to the uncertainties in data and parameters. An illustrative example is included that shows a possible situation of equilibrium between global costs and benefits.

2011

Long Term Evaluation of Operating Reserve with High Penetration of Renewable Energy Sources

Autores
Leite da Silva, AML; Rosa, MA; Sales, WS; Matos, M;

Publicação
2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING

Abstract
Due to the high penetration of renewable energy into the energy matrix of today's power networks, the design of generating systems based only on static reserve assessment does not seem to be enough to guarantee the security of power system operation. From the wind power integration perspective, this energy source imposes additional requirements, mainly due to the inherent unpredictable characteristic of the wind. Besides the uncertainties in load and generating unit availabilities, the operating reserve needs also to deal with the fluctuation characteristic of the wind power. Therefore, more flexibility of the conventional generators (hydro and thermal) is required to provide system support services. This paper discusses a new methodology based on chronological Monte Carlo simulation to evaluate the operating reserve requirements of generating systems with large amounts of renewable energy sources, in particular, wind power.

2007

Constrained Fuzzy Power Flow

Autores
Gouveia, E; Matos, MA;

Publicação
2007 IEEE LAUSANNE POWERTECH, VOLS 1-5

Abstract
In this paper a tool for the evaluation of transmission system adequacy is presented. Although similar in the basic assumptions to the classic versions of the Fuzzy Power Flow (FPF), the approach has significant differences in the formulation. First, it is symmetrical (no influence of the slack bus in the results), so all the fuzzy power injections are in the same situation. Second, by including line constraints, only feasible deterministic power flows are accepted in the fuzzy variables calculations, leading to a more correct representation of the possible impact of uncertainty. Third, recalculation of the estimated node fuzzy injections leads to a clear picture of the repressed power flows and thus of the adequacy of the grid. On the other hand, the Constrained Fuzzy Power Flow (CFPF) separates completely the analysis of the network from the generation influence and costs, which is indispensable in a unbundled organization of the power system.

2007

A regulatory framework for microgeneration and microgrids

Autores
Costa, PM; Matos, MA; Lopes, JAP;

Publicação
2007 IEEE LAUSANNE POWERTECH, VOLS 1-5

Abstract
The concept of microgrid (mu grid) has been emerging as a way to integrate microgeneration (mu G) in LV networks and simultaneously improve its potential benefits. Technical requirements to connect mu grids to LV networks have been studied in order to make this concept technologically feasible and safe to operate. However, the regulatory framework for economic integration of mu G and mu grids on distribution systems, despite being crucial, is still an open issue. The main purpose of this paper is to contribute for the development of an appropriate economic regulation framework that removes the barriers to mu G and mu grid development To do so, the relevant costs and benefits resulting from the establishment of mu G and mu grid are identified and a methodology for sharing those costs and benefits among the involved economic agents is presented. The only pre-requisite of such a methodology is that a net benefit to all economic agents exists, which is the case most of the times. An illustrative example is included