2020
Autores
Mello, J; Villar, J; Bessa, RJ; Lopes, M; Martins, J; Pinto, M;
Publicação
International Conference on the European Energy Market, EEM
Abstract
This paper proposes a Local Energy Market using a P2P blockchain-powered marketplace where agents bilaterally trade energy after the consumption and production period, and not before, as usual in electricity market design. The EU and MIBEL regulatory framework for Renewable Energy Communities potentially creates space for such a market, but some improvements in the settlement procedures and agent's participation must be met. © 2020 IEEE.
2020
Autores
Blanquet, A; Santo, BE; Basílio, J; Pratas, A; Guerreiro, M; Gouveia, C; Rua, D; Bessa, R; Carrapatoso, A; Alves, E; Madureira, A; Sampaio, G; Seca, L;
Publicação
IET Conference Publications
Abstract
The growing digitalisation, grid complexity and the number of digitally connected devices that communicate with systems in the distribution grid are enabling the continuous development of automation and intelligence, acquisition of data from sensors, meters and devices for monitoring and managing the distribution network, to achieve an enhanced, preventive, resilient and flexible network operation philosophy. This study presents a set of use cases towards the demonstration of the benefits of implementing a platform that collects, aggregates and facilitates horizontal integration and data correlation from various sources, enabling these use cases across the distribution grid. The adequacy analysis of current distribution network architecture considered derived requirements on the characterisation of its evolution taking advantage of key digital technologies, towards the implementation of distributed control and management strategies. It is also presented a benefit analysis of implementing a centralised common data and service platform, i.e. an internet of things (IoT) platform, regarding new functionalities and applications.
2020
Autores
Terras, JM; Simão, T; Rua, D; Coelho, F; Gouveia, C; Bessa, R; Baumeister, J; Prümm, RI; Genest, O; Siarheyeva, A; Laarakkers, J; Rivero, E; Bosco, E; Nemcek, P; Glennung, K;
Publicação
IET Conference Publications
Abstract
This study offers an overview of the H2020 InterConnect project, which targets the relation between smart homes and distribution grids. The project vision is to produce a digital marketplace, using an interoperable marketplace toolbox and Smart appliances REference Ontology (SAREF) compliant Internet of Things (IoT) reference architecture as the main backbone, through which all SAREF-ized services, compliant devices, platform enablers and applications can be downloaded onto IoT and smart grid digital platforms. Energy users in buildings, either residential or non-residential, manufacturers, distribution grid operators and the energy retailers will work together towards the demonstration of the smart energy management solutions in seven connected large-scale test-sites in Portugal, Belgium, Germany, the Netherlands, Italy, Greece and France. This study depicts how InterConnect project will enhance the relation and the interconnectivity between smart buildings and grids safeguarding the definition of the role of each stakeholder in energy and non-energy services.
2020
Autores
Giebel, G; Shaw, W; Frank, H; Pinson, P; Draxl, C; Zack, J; Möhrlen, C; Kariniotakis, G; Bessa, R;
Publicação
Abstract
2020
Autores
Kariniotakis, G; Camal, S; Bessa, R; Pinson, P; Giebel, G; Libois, Q; Legrand, R; Lange, M; Wilbert, S; Nouri, B; Neto, A; Verzijlbergh, R; Sauba, G; Sideratos, G; Korka, E; Petit, S;
Publicação
Abstract
2020
Autores
Tavares, B; Soares, FJ;
Publicação
ELECTRIC POWER SYSTEMS RESEARCH
Abstract
The increasing integration of Distributed Energy Resources (DER) in electricity networks has required an improvement in the network management procedures. While the operation paradigm is evolving and adapting to the new network features, the planning approach is rather inefficient as network assets are usually oversized to meet the worst-case scenario. In this regard, this paper presents an innovative methodology that integrates the potential flexibility of DER into the planning process, in an attempt to bridge the gap between current network operation approaches and the planning methods. It includes an analysis of future scenarios, providing different reinforcement plans considering the realistic network operation for those scenarios. The proposed optimal design of the reinforcement plans has two complementary processes: First to optimize flexible resources in their owner's perspective and second to reschedule the flexible resources' operation when the DSO needs to solve technical problems. The model has been tested in a typical Portuguese medium voltage network using future scenarios of DER integration from ENTSO-E. The results conclude that the proposed methodology leads to cost-effective solutions, which provide a better use of flexible resources, deferring high capital investments in network reinforcement.
The access to the final selection minute is only available to applicants.
Please check the confirmation e-mail of your application to obtain the access code.