2007
Autores
Moyano, CF; Lopes, JAP;
Publicação
POWERENG2007: INTERNATIONAL CONFERENCE ON POWER ENGINEERING - ENERGY AND ELECTRICAL DRIVES PROCEEDINGS, VOLS 1 & 2
Abstract
This paper presents an optimization strategy to be adopted at wind park control level. This approach transposes the classical formulations of a unit commitment and a generator dispatch problem to the turbines of a wind park, assuming that variable speed wind turbines are installed, and considering that wind speed forecasts are available. Wind speed forecasts, demands from grid operators or generation levels defined to comply with market strategies are the inputs of the problem. A small example is used to illustrate the proposed approach.
2007
Autores
Estanqueiro, AI; Tande, JO; Lopes, JAP;
Publicação
2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10
Abstract
In this paper the main parameters to assess the power quality of grid embedded wind farms are presented. International standards to assess and quantify the power quality of grid connected wind turbines exist for some years now, and are here extrapolated to wind farms. aggregates when possible being the correspondent methodologies identified in the document. Recently, the grid code requirements posed a novel challenge to this technologic area, particularly since they were issued with national or local objectives and without particular normalized global concerns. The form how the international standards are evolving in order to cope both with the power systems industry local requirements, but also with the global wind turbine manufacturers principles is addressed in the paper.
2007
Autores
Estanqueiro, AI; de Jesus, JMF; Ricardo, J; dos Santos, A; Lopes, JAP;
Publicação
2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10
Abstract
In this paper the existing technical barriers that prevent the accomplishment of a very high wind generation penetration in a power system are presented. Since several countries and regions in Europe are already experiencing such high wind penetration or, as a minimum, planning their grids and operation strategies to cope with wind penetration from a high to a very high level, the solutions already identified for the most common constraints are also identified.
2007
Autores
Moyano, CF; Pecas Lopes, JAP;
Publicação
2007 IEEE LAUSANNE POWERTECH, VOLS 1-5
Abstract
This paper presents a formulation for an Optimal Power Flow problem that includes the DFIG wind generator reactive power characteristics in order to obtain set points that consider wind turbines loading capabilities. This approach can be adopted at the wind park control level to define the active and reactive set points following requests from the wind park dispatch centers.
2007
Autores
Mendonca, A; Lopes, JAP;
Publicação
2007 IEEE LAUSANNE POWERTECH, VOLS 1-5
Abstract
This paper addresses the problem of large wind power integration and its impact on damping of the electromechnnical modes of oscillation. The viability of the doubly fed induction generator (DFIG) supplying additional damping is discussed and power system stabilizers (PSS) installed in DFIG wind power generators are simultaneously tuned to increase damping levels of a multimachine system.
2007
Autores
Moreira, CL; Pecas Lopes, JA;
Publicação
2007 International Conference on Clean Electrical Power, ICCEP '07
Abstract
MicroGrids comprise low voltage distribution systems with distributed energy sources, storage devices and controllable loads, operated interconnected with the main power grid or autonomously, in a controlled coordinated way. Storage devices are absolutely essential for MicroGrid autonomous operation. However, depending on the operating conditions, their limited storage capacity is a major drawback and might compromise successful MicroGrid islanded operation. In this paper is proposed an index to evaluate MicroGrids security regarding an unplanned transition to islanded operation due to disturbances in the upstream Medium Voltage network. An Artificial Neural Network tool is proposed to forecast the security index for a credible range of operating scenarios. The usage of Artificial Neural Networks is emphasized due to its computational speed for on-line performance and its flexibility for providing corrective actions for insecure operating conditions in order to achieve a seamless transition from interconnected to islanded operation. © 2007 IEEE.