Scheduling and Batching in Shop Environments

Autores
Santos, AS; Madureira, AM; Varela, MLR; Putnik, GD; Kays, HME; Karim, ANM;

Publicação
PROCEEDINGS OF THE 2015 10TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI 2015)

Abstract
Global competition nd the customers demand for customized products with shorter due dates, marked the roduction of the Extended Enterprise. In this Extended Manufacturing Environment (EME), lean, virtual, networked and distributed enterprises collaborate respond to the market demands. In this paper we study the influence of the batch size on Flexible Flow Shop makespan minimization problem FFC parallel to C-max for two multi-sites approaches, the FSBE (Flow Shop Based Factories) and the PMBF (Parallel-Machines Based Factories). The computational study demonstrates how the performance of the PMBF model decreases with the increase of batch size and determines the batch sizes in which the performance is similar.

2015

An integer programming approach for Balancing and Scheduling in Extended Manufacturing Environment

Autores
Kays, HME; Karim, ANM; Varela, MLR; Santos, AS; Madureira, AM;

Publicação
PROCEEDINGS OF THE 2015 10TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI 2015)

Abstract
In the fiercely competitive era induced by expansion of open business archetypes, the managerial aspects of Extended Manufacturing Environments (EMEs) are experiencing growing concerns. There is no scope of leaving a possible operational improvement unexplored. For enhanced operational efficiency and capacity utilization the balancing and scheduling problems of EMEs are, therefore, rightfully considered and an integer programme is proposed in this paper. The model is designed in a spread sheet and solved through What's Best optimizer. The model capabilities is assessed through a test problem. The results have demonstrated that the model is capable of defining optimized production schedules for EMEs.

2015

Scheduling and Batching in Multi-Site Flexible Flow Shop Environments

Autores
Santos, AS; Madureira, AM; Varela, MLR; Putnik, GD; Kays, HME; Karim, ANM;

Publicação
2015 10TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI)

Abstract
Global competition and the customers demand for customized products with shorter due dates, marked the introduction of the Extended Enterprise. In this Extended Manufacturing Environment (EME), lean, virtual, networked and distributed enterprises collaborate to respond to the market demands. In this paper we study the influence of the batch size on Flexible Flow Shop makespan minimization problem FFC vertical bar vertical bar C-max for two multi-sites approaches, the FSBF (Flow Shop Based Factories) and the PMBF (Parallel-Machines Based Factories). The computational study demonstrates how the performance of the PMBF model decreases with the increase of batch size and determines the batch sizes in which the performance is similar.

2015

An integer programming approach for Balancing and Scheduling in Extended Manufacturing Environment

Autores
Kays, HME; Karim, ANM; Varela, MLR; Santos, AS; Madureira, AM;

Publicação
2015 10TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI)

Abstract
In the fiercely competitive era induced by expansion of open business archetypes, the managerial aspects of Extended Manufacturing Environments (EMEs) are experiencing growing concerns. There is no scope of leaving a possible operational improvement unexplored. For enhanced operational efficiency and capacity utilization the balancing and scheduling problems of EMEs are, therefore, rightfully considered and an integer programme is proposed in this paper. The model is designed in a spread sheet and solved through What'sBest optimizer. The model capabilities is assessed through a test problem. The results have demonstrated that the model is capable of defining optimized production schedules for EMEs.

2015

Selection Constructive based Hyper-heuristic for Dynamic Scheduling

Autores
Gomes, S; Madureira, A; Cunha, B;

Publicação
2015 10TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI)

Abstract
Manufacturing environments require a real-time adaptation and optimization method to dynamically and intelligently maintain the current scheduling plan feasible. This way, the organization keeps clients satisfied and achieves its objectives (costs are minimized and profits maximized). This paper proposes an optimization approach - Selection Constructive based Hyper-heuristic for Dynamic Scheduling - to deal with these dynamic events, with the main goal of maintaining the current scheduling plan feasible and robust as possible. The development of this dynamic adaptation approach is inspired on evolutionary computation and hyper-heuristics. Our empirical results show that a selection constructive hyper-heuristic could be advantageous on solving dynamic adaptation optimization problems.

2015

Q-Learning Based Hyper-Heuristic For Scheduling System Self-Parameterization

Autores
Falcao, D; Madureira, A; Pereira, I;

Publicação
2015 10TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI)

Abstract
Optimization in current decision support systems has a highly interdisciplinary nature related with the need to integrate different techniques and paradigms for solving real-world complex problems. Computing optimal solutions in many of these problems are unmanageable. Heuristic search methods are known to obtain good results in an acceptable time interval. However, parameters need to be adjusted to allow good results. In this sense, learning strategies can enhance the performance of a system, providing it with the ability to learn, for instance, the most suitable optimization technique for solving a particular class of problems, or the most suitable parameterization of a given algorithm on a given scenario. Hyper-heuristics arise in this context as efficient methodologies for selecting or generating (meta) heuristics to solve NP-hard optimization problems. This paper presents the specification of a hyper-heuristic for selecting techniques inspired in nature, for solving the problem of scheduling in manufacturing systems, based on previous experience. The proposed hyper-heuristic module uses a reinforcement learning algorithm, which enables the system with the ability to autonomously select the meta-heuristic to use in optimization process as well as the respective parameters. A computational study was carried out to evaluate the influence of the hyper-heuristics on the performance of a scheduling system. The obtained results allow to conclude about the effectiveness of the proposed approach.