Cookies Policy
The website need some cookies and similar means to function. If you permit us, we will use those means to collect data on your visits for aggregated statistics to improve our service. Find out More
Accept Reject
  • Menu
Publications

Publications by Luís Manuel Rodrigues

2024

GDBN, a Customer-centric Digital Platform to Support the Value Chain of Flexibility Provision

Authors
Coelho, F; Rodrigues, L; Mello, J; Villar, J; Bessa, R;

Publication
2024 20TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET, EEM 2024

Abstract
This paper proposes an original framework for a flexibility-centric value chain and describes the pre-specification of the Grid Data and Business Network (GDBN), a digital platform to provide support to the flexibility value chain activities. First, it outlines the structure of the value chain with the most important tasks and actors in each activity. Next, it describes the GDBN concept, including stakeholders' engagement and conceptual architecture. It presents the main GDBN services to support the flexibility value chain, including, matching consumers and assets and service providers, assets installation and operationalization to provide flexibility, services for energy communities and services, for consumers, aggregators, and distribution systems operators, to participate in flexibility markets. At last, it details the workflow and life cycle management of this platform and discusses candidate business models that could support its implementation in real-life scenarios.

2025

Digital platforms to support the flexibility value chain, run flexibility markets, and manage energy communities

Authors
Rodrigues, L; Coelho, F; Mello, J; Villar, J;

Publication
Current Sustainable/Renewable Energy Reports

Abstract
Purpose of Review: This paper reviews the flexibility-centric value chain (FCVC) and analyses how coordinating digital platforms along the FCVC is essential for enabling FCVC activities and supporting key actors. Based on the FCVC, the digital infrastructure needed to support flexibility provision in power systems is reviewed, with special focus on the role of energy communities (ECs) as emerging relevant actors and potential aggregators of its members. Recent Findings: We review the Grid Data and Business Network (GDBN), a platform developed by the authors to support the FCVC, with special focus on those stages of the FCVC not properly supported by existing solutions. It also analyses platforms used in local flexibility markets (LFMs), and it presents the RECreation digital platform designed to manage ECs to support the participation in flexibility markets. Summary: Digital platforms are necessary for scaling flexibility services. The GDBN offers a comprehensive approach by enabling the FCVC and facilitating interoperability with existing platforms dedicated to specific segments, such as ECs and LFMs. By addressing current limitations in platform integration, this paper contributes to a clearer understanding of how digital tools can enable an efficient flexibility ecosystem. © The Author(s) 2025.

2025

Integrating Cross-Sector Flexible Assets in Flexibility Bidding Curves for Energy Communities

Authors
Rodrigues, L; Mello, J; Silva, R; Faria, S; Cruz, F; Paulos, J; Soares, T; Villar, J;

Publication
International Conference on the European Energy Market, EEM

Abstract
Distributed energy resources (DERs) offer untapped potential to meet the flexibility needs of power systems with a high share of non-dispatchable renewable generation, and local flexibility markets (LFMs) can be effective mechanisms for procuring it. In LFMs, energy communities (ECs) can aggregate and offer flexibility from their members' DERs to other parties. However, since flexibility prices are only known after markets clear, flexibility bidding curves can be used to deal with this price uncertainty. Building on previous work by the authors, this paper employs a two-stage methodology to calculate flexibility bids for an EC participating in an LFM, including not only batteries and photovoltaic panels, but also cross-sector (CS) flexible assets like thermal loads and electric vehicles (EVs) to assess their impact. In Stage 1, the EC manager minimizes the energy bill without flexibility to define its baseline. In Stage 2, it computes the optimal flexibility to be offered for each flexibility price to build the flexibility bidding curve. Case examples allow to assess the impact of CS flexible assets on the final flexibility offered. © 2025 IEEE.

2025

Planning Energy Communities with Flexibility Provision and Energy and Cross-Sector Flexible Assets

Authors
Rodrigues, L; Silva, R; Macedo, P; Faria, S; Cruz, F; Paulos, J; Mello, J; Soares, T; Villar, J;

Publication
International Conference on the European Energy Market, EEM

Abstract
Planning Energy communities (ECs) requires engaging members, designing business models and governance rules, and sizing distributed energy resources (DERs) for a costeffective investment. Meanwhile, the growing share of nondispatchable renewable generation demands more flexible energy systems. Local flexibility markets (LFMs) are emerging as effective mechanisms to procure this flexibility, granting ECs a new revenue stream. Since sizing with flexibility becomes a highly complex problem, we propose a 2 -stage methodology for estimating DERs size in an EC with collective self-consumption, flexibility provision and cross-sector (CS) assets such as thermal loads and electric vehicles (EVs). The first stage computes the optimal DER capacities to be installed for each member without flexibility provision. The second stage departs from the first stage capacities to assess how to modify the initial capacities to profit from providing flexibility. The impact of data clustering and flexibility provision are assessed through a case study. © 2025 IEEE.

  • 2
  • 2