2021

FEEdBACk: An ICT-Based Platform to Increase Energy Efficiency through Buildings' Consumer Engagement

Autores
Soares, F; Madureira, A; Pages, A; Barbosa, A; Coelho, A; Cassola, F; Ribeiro, F; Viana, J; Andrade, J; Dorokhova, M; Morais, N; Wyrsch, N; Sorensen, T;

Publicação
ENERGIES

Abstract
Energy efficiency in buildings can be enhanced by several actions: encouraging users to comprehend and then adopt more energy-efficient behaviors; aiding building managers in maximizing energy savings; and using automation to optimize energy consumption, generation, and storage of controllable and flexible devices without compromising comfort levels and indoor air-quality parameters. This paper proposes an integrated Information and communications technology (ICT) based platform addressing all these factors. The gamification platform is embedded in the ICT platform along with an interactive energy management system, which aids interested stakeholders in optimizing "when and at which rate" energy should be buffered and consumed, with several advantages, such as reducing peak load, maximizing local renewable energy consumption, and delivering more efficient use of the resources available in individual buildings or blocks of buildings. This system also interacts with an automation manager and a users' behavior predictor application. The work was developed in the Horizon 2020 FEEdBACk (Fostering Energy Efficiency and BehAvioral Change through ICT) project.

2021

Real-World Implementation of an ICT-Based Platform to Promote Energy Efficiency

Autores
Dorokhova, M; Ribeiro, F; Barbosa, A; Viana, J; Soares, F; Wyrsch, N;

Publicação
ENERGIES

Abstract
The energy efficiency requirements of most energy-consuming sectors have increased recently in response to climate change. For buildings, this means targeting both facility managers and building users with the aim of identifying potential energy savings and encouraging more energy-responsible behaviors. The Information and Communication Technology (ICT) platform developed in Horizon 2020 FEEdBACk project intends to fulfill these goals by enabling the optimization of energy consumption, generation, and storage and control of flexible devices without compromising comfort levels and indoor air quality parameters. This work aims to demonstrate the real-world implementation and functionality of the ICT platform composed of Load Disaggregation, Net Load Forecast, Occupancy Forecast, Automation Manager, and Behavior Predictor applications. Particularly, the results obtained by individual applications during the test phase are presented alongside the specific metrics used to evaluate their performance.

2022

The Role of Hydrogen Electrolysers in the Frequency Containment Reserve: A Case Study in the Iberian Peninsula up to 2040

Autores
Ribeiro F.J.; Lopes J.A.P.; Fernandes F.S.; Soares F.J.; Madureira A.G.;

Publicação
SEST 2022 - 5th International Conference on Smart Energy Systems and Technologies

Abstract
This paper investigates the contribution of hydrogen electrolysers (HEs) as highly controllable loads in the context of the Frequency Containment Reserve (FCR), in future operation scenarios on the Iberian Peninsula (IP). The research question is whether HEs can mitigate system insecurity regarding frequency or Rate of Change of Frequency (RoCoF) in critical periods of high renewable energy penetration (i.e. low system inertia), due to the fact that these periods will coincide with high volume of green hydrogen production. The proposed simulation platform for analysis consists of a simplified dynamic model developed in MATLAB/Simulink. The results obtained illustrate how HEs can outperform conventional generators on the provision of FCR. It is seen that the reference incident of 1GW loss in the IP in a 2040 low inertia scenario does not lead to insecure values of either frequency or Rate of Change of Frequency (RoCoF). On the other hand, an instantaneous loss of inverter-based resources (IBR) generation following a short-circuit may result in RoCoF violating security thresholds. The obtained results suggest that the HEs expected to be installed in the IP in 2040 may contribute to reduce RoCoF in this case, although this mitigation may be insufficient. The existing FCR mechanism does not fully exploit the fast-ramping capability of HEs; reducing measurement acquisiton delay would not improve results.

2024

Hydrogen Electrolyser participation in Automatic Generation Control using Model Predictive Control

Autores
Ribeiro, FJ; Lopes, JAP; Soares, FJ; Madureira, AG;

Publicação
2024 INTERNATIONAL CONFERENCE ON SMART ENERGY SYSTEMS AND TECHNOLOGIES, SEST 2024

Abstract
Traditionally, proportional-integral (PI) control has ensured the successful application of automatic generation control (AGC). Two design features of AGC-PI are the following: (1) it is merely a reactive system which does not take full advantage of existing knowledge about the system and (2) the control signal sent to all units is divided proportionally to their participation in the AGC. These two features ensure simplicity and, thus, reliability for the regular functioning of the power system. However, when the power system is recovering from a loss of generation, such features can become shortcomings. This paper proposes a model predictive control (MPC) to improve performance of AGC in such a scenario. The contrast with the traditional approach is as follows: instead of using merely two system measures which are also the control objectives (frequency and interconnection flow), the proposed controller relies on an internal model that takes advantage of further known variables of the power system, especifically the ramping capabilities of participating units. While still respecting the participation factors, it is shown that the proposed model allows to exhaust earlier the availability of faster units, such as some demand response, as the one to be provided by hydrogen electrolysers, and thus reestablishes the frequency and interconnection flows in a faster way than typical AGC-PI.

2024

A novel TSO settlement scheme for the Frequency Containment Reserve Cooperation in Europe's integrated electricity market

Autores
Ribeiro, FJ; Lopes, JAP; Soares, FJ; Madureira, AG;

Publicação
UTILITIES POLICY

Abstract
Frequency Containment Reserve (FCR) Cooperation is a European effort to integrate several countries in an integrated international electricity market platform for FCR procurement. In this market, Balancing Service Providers (BSPs) are on the supply side and Transmission System Operators (TSOs) on the demand side. This paper proposes a novel settlement scheme for sharing costs among TSOs; it proposes no changes to existing market clearing rules or to the existing settlement of the BSPs' revenues. It is shown that the current TSO settlement scheme is an inequitable mechanism that originates negative costs for some TSOs in specific conditions, which are extensively discussed. The proposed TSO settlement scheme overcomes these inequities. In the proposed scheme, TSOs begin paying the local BSPs for the cleared bids needed locally, and the remaining imports are calculated in a subsequent step. Doing so avoids using the so-called import/export costs, which are demonstrated to be the source of the inequities in the current scheme. It is shown that if the proposed pricing scheme had been adopted from July 2019 to December 2022, all TSOs would have been affected. Specifically, the most negatively impacted TSO would have its accumulated costs increased by 16% and the most positively impacted TSO would have its accumulated cost decreased by 32%. The inequities of the current mechanism amount to more than 50 Me or 7.4% of the total accumulated costs. Although the proposed mechanism is tested here under the FCR Cooperation, it can be applied to other markets where the rules allow different local settlement prices.

2024

VPP Participation in the FCR Cooperation Considering Opportunity Costs

Autores
Ribeiro, FJ; Lopes, JAP; Soares, FJ; Madureira, AG;

Publicação
APPLIED SCIENCES-BASEL

Abstract
Currently, the transmission system operators (TSOs) from Portugal and Spain do not procure a frequency containment reserve (FCR) through market mechanisms. In this context, a virtual power plant (VPP) that aggregates sources, such as wind and solar power and hydrogen electrolyzers (HEs), would benefit from future participation in this ancillary service market. The methodology proposed in this paper allows for quantifying the revenues of a VPP that aggregates wind and solar power and HEs, considering the opportunity costs of these units when reserving power for FCR participation. The results were produced using real data from past FCR market sessions. Using market data from 2022, a VPP that aggregates half of the HEs and is expected to be connected in the country by 2025 will have revenues over EUR 800k, of which EUR 90k will be HEs revenues.