José Coelho holds a PhD in Systems Engineering from the Technical University of Lisbon in 2004. It is an Assistant Professor at the Open University in the Department of Science and Technology. Published 12 papers in international journals and more than 35 varied nature of resources in the open repository. In their professional activities interacted with 36 employees in co-authorships of scientific papers.

Interest
Topics
Details

Details

001
Publications

2018

An exact composite lower bound strategy for the resource-constrained project scheduling problem

Authors
Coelho, J; Vanhoucke, M;

Publication
Computers and Operations Research

Abstract
This paper reports on results for the well-known resource-constrained project scheduling problem. A branch-and-bound procedure is developed that takes into account all best performing components from literature, varying branching schemes and search strategies, using the best performing dominance rules and assembling these components into a unified search algorithm. A composite lower bound strategy that statically and dynamically selects the best performing bounds from literature is used to find optimal solutions within reasonable times. An extensive computational experiment is set up to determine the best combination of the various components used in the procedure, in order to benchmark the current existing knowledge on four different datasets from the literature. By varying the network topology, resource scarceness and the size of the projects, the computational experiments are carried out on a diverse set of projects. The procedure was able to find some new lower bounds and optimal solutions for the PSPLIB instances. Moreover, new best known results are reported for other, more diverse datasets that can be used in future research studies. The experiments revealed that even project instances with 30 activities cannot be solved to optimality when the topological structure is varied. © 2018 Elsevier Ltd

2018

A tool to test and validate algorithms for the resource-constrained project scheduling problem

Authors
Vanhoucke, M; Coelho, J;

Publication
Computers and Industrial Engineering

Abstract
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project databases has been given for integrated project management and control. These databases are collections of the most well-known and widespread data instances available in literature for the construction of a baseline schedule, the analysis of schedule risk or the use for project control. The current paper serves as a follow-up study to further elaborate on the use of these data instances, and to give researchers an incentive to use these datasets for their research on the development and validation of new algorithms for project scheduling. Therefore, unlike the general focus of the previous paper on baseline scheduling, schedule risk analysis and project control, the focus on the current paper is restricted to resource-constrained project scheduling. The intention of this follow-up overview is fourfold. First and foremost, a procedure is proposed to facilitate the reporting of best known solutions for the well-known single- and multi-mode resource-constrained project scheduling problem to minimize the project makespan. Secondly, the paper reports our best known solutions we obtained so far, and reflects on the network and resource parameters that increase the project complexity. In doing so, areas to focus on for future research are detected, and an attempt to define hard problem instances is given. Thirdly, a new dataset is presented for the resource-constrained project scheduling problem that is much more diverse in both the network topology and resource scarceness and will enable the future researcher to develop algorithms to solve a wider range of project problems. Finally, the paper also adds some links to tutorials and other relevant information to stimulate researchers to download the data and update best known solutions once available. © 2018 Elsevier Ltd

2017

Prazerosa – Interactive Reading Chair

Authors
Gaspar, RMA; Coelho, JPFdS; Bastos, GML;

Publication
International Journal of Creative Interfaces and Computer Graphics

Abstract

2016

An overview of project data for integrated project management and control

Authors
Vanhoucke, M; Coelho, J; Batselier, J;

Publication
Journal of Modern Project Management

Abstract
In this paper, an overview is given of the project data instances available in the literature to carry out academic research in the field of integrated project management and control. This research field aims at integrating static planning methods and risk analyses with dynamic project control methodologies using the state-of-the-art knowledge from literature and the best practices from the professional project management discipline. Various subtopics of this challenging discipline have been investigated from different angles, each time using project data available in literature, obtained from project data generators or based on a sample of empirical case studies. This paper gives an overall overview of the wide variety of project data that are available and are used in various research publications. It will be shown how the combination of artificial data and empirical data leads to improved knowledge on and deeper insights into the structure and characteristics of projects useful for academic research and professional use. While the artificial data can be best used to test novel ideas under a strict design in a controlled academic environment, empirical data can serve as the necessary validation step to translate the academic research results into practical ideas, aiming at narrowing the bridge between the theoretical knowledge and practical relevance. A summary of the available project data discussed in this paper can be downloaded from http://www.projectmanagement.ugent.be/research/data.

2016

An approach using SAT solvers for the RCPSP with logical constraints

Authors
Vanhoucke, M; Coelho, J;

Publication
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH

Abstract
This paper presents a new solution approach to solve the resource-constrained project scheduling problem in the presence of three types of logical constraints. Apart from the traditional AND constraints with minimal time-lags, these precedences are extended to OR constraints and bidirectional (BI) relations. These logical constraints extend the set of relations between pairs of activities and make the RCPSP definition somewhat different from the traditional RCPSP research topics in literature. It is known that the RCPSP with AND constraints, and hence its extension to OR and BI constraints, is NP-hard. The new algorithm consists of a set of network transformation rules that removes the OR and BI logical constraints to transform them into AND constraints and hereby extends the set of activities to maintain the original logic. A satisfiability (SAT) solver is used to guarantee the original precedence logic and is embedded in a metaheuristic search to resource feasible schedules that respect both the limited renewable resource availability as well as the precedence logic. Computational results on two well-known datasets from literature show that the algorithm can compete with the multi-mode algorithms from literature when no logical constraints are taken into account. When the logical constraints are taken into account, the algorithm can report major reductions in the project makespan for most of the instances within a reasonable time.