Power Systems
[Closed]
Work description
The work to be developed is for the assessment of the objectives of the of the last National Energy and Climate Plans (NECP) of Portugal (and possible Spain) for 2030, by adapting and applying the MIBEL market model CEVESA.
Academic Qualifications
Master Degree in Electrical Engineering, Informatics, Computer Science or similar.
Minimum profile required
Knowledge of programming languages. Fluency in English.
Preference factors
Preferred Profile: Background in electric power systems. Electricity Markets. GAMS and CPLEX. Excel VBA.
Application Period
Since 14 Aug 2019 to 15 Sep 2019
[Closed]
Cluster / Centre
Power and Energy / Power and Energy Systems